Power shutdown areas – Chennai (02-Aug-2018)

Power supply will be suspended in the following areas on 02-08-18 between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 4.00 P.M. if the works are completed.

Melur: Minjur Town (full), Seemavaram, BDO Office, Melur area, Pattamandiri, Vallur, Athipattu, Gounderpalayam, Subbareddy Palayam, Pallipuram.
Padi: Canal Road, Balaji Street, DRJ Hospital to Senthil Nagar, Ranga Gardens Ciyathamman Nagar, Vanasakthi Nagar, Murugan Koil Street, Vanasakthi Nagar extn., Thirumalai Nagar, parts of Vivekananda Road, Hussion Colony, Bharath Rajive Gandhi Nagar.
Kodungaiyur: Muthumizh Nagar 1st,4th, 6th, 8th Block, TH Road,Kaveri Road, Union Road, Muthumariamman Koil Street, Parthasarathy Reddy Street.
Menambedu: Gangai Nagar, Chenguttuvan Nagar, Oragadam, Chendrasekara Puram, Gnanamoorthy Nagar, Karukku, Vijayalakshmi Puram, Banu Nagar, Pudur, Red Hills Road (one part), Kallikuppam, Menambedu, Prithivipakkam.