Power shutdown areas – Chennai (14-Nov-2018)

Power supply will be suspended in the following areas on the following dates in the following areas between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 4.00 P.M. if the works are completed.

Gummidipoondi SIPCOT – I to IV Area : Gummidipoondi SIPCOT SS I-IV Industrial complex area, Gummidipoondi Bazaar, New Gummidipoondi, Bypass road, Ma Po Si Nagar, Munusamy Nagar, SR Kandigai, Thambureddy Palayam, Rettembedu, Rajapalayam, Perianatham, Mangavaram, Appavaram, Choliampakkam, Ayanallur & Enathimelpakkam, Chithala Kuppam, GP Kandigai, Papamkuppam, Chitrarajakandigai, Madarpakkam, Pallavada, Poovalai, Kannanbakkam, Kondamanalore, Equarpalayam, Arambakkam, Nemalure, Budur, Shirupuzhalpettai, Part of Poovalambedu, GR Kandigai, Kayalarmedu, Elavoor, Pethilkuppam village, Sunnambukulam, Chinaobalapuram, Thalayaripalayam.
Durainallur Area : Arani, Elavambedu, Sompattu, Puduvoyal, Panjetty, Peravallur, Kavarapettai, Chinnambedu, Durainallur.
Ponneri Area : Arasur, Periyakavanam, Eliambedu, Anuppambattu, AR Palayam, Aladu, Perumbedu, Venbakkam, Ponneri, Kodur.
Medur Area : Medur, Pulicot, Avoorivakkam, Kollur, Arasur, Annamalaichery.
Devambedu Area : Devambedu, Agaram, Kallore, Poongulam, Seganiyum, Rakkampalayam.
Irulipattu Area : Alinijivakkam, Athipattu, Irulipattu, Janapachatram, PP Road, Jaganathapuram road, Saikiruba Nagar, Virundhavan Nagar.
Kavarapettai Area : Thandalachery, Panapakkam.