Power supply will be suspended in the following areas on the following dates in the following areas between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 4.00 P.M. if the works are completed.
Ponneri: Arasur, Periyakavanam, Vellodai, Devadanam, Eliambedu, Annuppampattu, A.R. Palayam, Aladu, Perumbedu, Venbakkkam, T.V. Puram, Ponneri, Kodur.
Hasthinapuram: Hasthinapuram Main Road, Alsa Garden, Santhakrishnan St, Ramamoorthy St, Kakilanchavadi, GST Service Road (East side), MIT Bridge, SBI colony, Purushotham Nagar, Kumarankundram, Valliammal St, Anjaneyar Koil St.
Ramapuram: Bharathi Salai, Valluvar Salai, Sathya Nagar, Sabari Nagar, Mugalivakkam, Manapakkam, Ramapuram, Poonamallee, Nesapakkam, Jayabalaji Nagar, Venkataraman Salai, Soolai Pallam (MGR Nagar),Venkateswara Nagar, Kolapakkam.
Perungudi: Ezhil Nagar, Balaji Nagar, Pillaiyar koil St, East OMR, Mettukuppam, VPG avenue and Extension, Ambal avenue, Royal avenue, Kamaraj St, Indira Gandhi St, Pamban Nagar, Secretariat colony, Kumaran Kudil, Sakthi Sreenivasan Salai, Devaraj Avenue, Parthasarathy Nagar, New St, Annai Parvathy Nagar, part of Neelanakarai.
Nolambur: NNS, HIG, MIG, Chinna Nolambur, Adayalampet, Kongu Nagar, Mogappair West Block 1 to 8 th Block, Rajankuppam, Panneer Nagar, Mohanram Nagar, Jaswanth Nagar, Reddy Palayam area AIBEA Nagar, Vellar St, Eri Scheme, Gangai Amman Nagar, Ponniamman Nagar, Keel Ayanambakkam.
Thiruneermalai: Subraya Nagar, Saraswathipuram, Jain complex, Thiruneermalai.
Thiruvanmiyur: Part of L.B.Road, 4 th West St to 12th West Street Kamaraj Nagar, Canal Road, Ranganathanpuram, Judges Avenue, Pathyway, Rathinam Nagar, Mangaleri one part, ECR part, Appasamy apartments, Rajaji Nagar 1 St, Ganesh Nagar, Nathan complex and TNHB colony.1