Power shutdown areas – Chennai (06-Oct-2018)

Power supply will be suspended in the following areas on the following dates in the following areas between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 4.00 P.M. if the works are completed.

MEPZ 
MEPZ Area, Thiruneermalai, Suburaya Nagar.
Valluvarkottam 
Cathedral Garden Road, G.N. Chetty Road, G.K.Puram, Vidyodaya 1 and 2nd Cross Street, Giri Road, New Giri Road, Habibullah Road, Thirumoorthy Nagar 1st to 6th Street, Vaidyanathan Street, Veerabadran Street, Pudukulla Street, Josiyar Street, Nageswara Road, Mahalingapuram entire, Mahalingapuram Maub Pushpa Nagar, Nungambakkam Lake area, Valluvarkottam High Road, Tank Bund Road, Kamarajapuram, Kajjab Colony, Kamdar Nagar, Thirumalai Pillai Road, Kuppusamy Street, Habibullah Road, Sivasailam Street, Solaiappan Street, Periyar Road, Dharmapuram ( I and XII) Street, Sarathambal Street, Part of Thirumoorthy Street, Bharathi Nagar (1 Street and 4th ) Street, Part 6 North Usman Road, Ramakrishna Puram, Sarangapani Street, Arulambal Street, Part of GN Chetty Road, North Boag Road Main (1 Street , 2nd , 3rd ) Street, part of VRC Road, Police Quarters, Sundarrao Street, Xavier Street, Egalai (1 Street , 2nd and 3rd ) Street, Part of Anna Salai and Congress Building, Kodambakkam High Road, Porur Somasundaram Street, Padmanaban Street, Kanniah Street.
Ramapuram
Bharathi Salai, Valluvar Salai, Sathya nagar, Sabari nagar, Mugalivakkam, Manapakkam, Ramapuram, Poonamalli high road, Nesapakkam, Jayabalaji nagar, Venkataraman Salai, Soolai Pallam (MGR Nagar),Venkateswara nagar, Kolapakkam.
Puzhal 
Surapet, Puthagaram, JP Nagar, Ezhil Nagar, Shanmugapuram, Madanamkuppam, Brindavan Nagar, Indira Nagar, Bharathidasan Nagar, Sivaprakasam Nagar.