Power shutdown areas – Chennai (11-Oct-2018)

Power supply will be suspended in the following areas on the following dates in the following areas between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 4.00 P.M. if the works are completed.

East Tambaram area: Velachery main road, Bharatha Madha Street, Aagastinar Street, Bharathiyar Street, Pookar Street, Kambar Street, Nalwar Street, Anjanayar Koil Street, Annadurai Street, Antony Pillai Street, Ambedkar Street, Thilagar Street, Albert Ponnusamy Street, Lalbhadoor Sasthri Street, Kalamegam Street, Vinayagapuram.
Perungalathur area: Moovaenthar Nagar, Veeralakshmi Nagar, Maduchur Road.
Korattur area: RS Road, Reddy Street, Pthiamman Koil Street, Gangai Amman Koil Street, Mariamman Koil Street, Bramin Street, Sasthire Square, Pillaiyar Koil street, New Pillaiyar Koil Street, Manicumpillai Street, Menambedu Road, Vanniyar Street, Thirumullivoyal Road, Kamaraja Nagar, Nehru Nagar, Thillai Nagar Extn, Mugappair Road, Atimoolam Avenue, Green View Colony, MTH Road, Nehru Street, Singaram Pillai Street.
 
Puzhal area: GNT Road, Thiruneelakandar Nagar, Checkpost, Pudu Nagar, Arron Ulasa Nagar, Kannappasamy Nagar, Samiyar Madam, Vadakarai Road.
Red Hills area: Alingivakkam, Vilangattupakkam, Kannampalayam, Sendrampakkam, Thiyampakkam, Kosappur, part of Vadakarai.

 

Be the first to comment

Leave a Reply

Your email address will not be published.


*