Power shutdown areas – Chennai (26-Sep-2018)

Power supply will be suspended in the following areas on the following dates in the following areas between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 4.00 P.M. if the works are completed.

Thiruverkadu: Thiruverkadu Co-Op nagar, Goparasanallur, Mooventhar nagar, Pillaiyarmadanthangal, Ashok Nandavanam, Ishwarya garden, P.H.road, Saveetha Dental Hospital, KGP nagar, Rani Anna nagar, Perumalagarm, Kendriya Vihar, Vada Noombal, Noombal road, Abirami nagar, Mahalakshmi nagar, K.P.S.nagar, Sundaracholapuram, Velappan chavadi, Mathiravedu, Kaveri nagar, Pallikupam.